The Behälterraum (fuel tank chamber) temporarily fitted to the rear section framework. The top of the chamber is part of the cockpit floor. |
The jack up pipe is located on frame 13. A cut-out is therefore necessary in the MDF frame. |
Bottom view of the framework. Frame 1 will be added soon at the very front of the framework. This will be the engine mounting frame done from plywood rather than MDF. |
The outline of the cockpit floor is not yet finished. |
No comments:
Post a Comment